Bargara/Bundaberg 560mm Sewer Project

Project Name – Bargara/Bundaberg 560mm Sewer Project Project Location – Bargara/Bundaberg Queensland Project Description – Welding and internal debeading 560mm HDPE pipe ready for RCC Civil to install. Project Date – August 2023

Chiller Plant Lines

Project Name: Chiller Plant Lines Project Location: South Australia Client: Awcon/BHP Project Date: June 2023 Project Description: Fabricate and install 500mm HDPE line for new onsite chiller plant.

Bell River Pedestrian Bridge

Project Name: Bell River Pedestrian Bridge Project Location: Wellington NSW Client: Teleo Design Project Date: 2022 Project Description: Supply and installation of precast footings for bridge approaches. Set out, excavation and pouring of bridge piling.

Illaroo Road Water Pump Station

Project Name: Illaroo Road Water Pump Station Project Location: Cambewarra NSW Client: Utilstra Pty LTD Project Date: May 2023 Project Description: Welding of 7.1km water pipeline with pipe sizes range from 355mm PN16 through to 450mm PN25. Project consisting of approx. 600 field welds

Tailings Storage Facility Upgrade Stage 1

Poly-Welding-piping-orange

Project Name: Tailings Storage Facility Upgrade Stage 1 Project Location: Tomingley Gold Mine Project Date: March 2023 Project Description: Welding of 5,500m of 250mm and 2,000m 180mm HDPE in preparation for stage 1 lift completion, welding completed with a small crew of 4 over a 6-day window.